WRKJOBSCDE PROJEXXREF – @GENXREF PROJEX4i Scheduled Database Rebuild

0 Comments

The PROJEXXREF Scheduled Job Entry

Many of the commands in Projex4i use an internal database which is rebuilt on a scheduled basis using the IBM i scheduled job process.

The database is built using the Prjoex4i internal @GENXREF command:

Change Job Schedule Entry
Work with job scheduled entries

The @GENXREF command will use various DSPFD, DSPOBJD, DSPPGM, DSPPGMREF, RTVDSKINF to generate a bunch of large output files.

By default, when Projex4i is installed, the job scheduler is set up to rebuild the database daily (Monday thru Friday).

About the author 

Software Projex

Home of free IBM i | System i | iSeries | AS400 software utilities since the twentieth century.

{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}
Subscribe to get the latest updates
>